St Ebbes Primary is a 33 kV primary substation in England, United Kingdom, with 0 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 15 / 30MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromOxford (Osney) BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromCowley GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.7480, -1.2589SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 321 power plants (119 operating, 1,709 MW), 179 grid connections (87 operating, 975 MW) and 35 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
University Shared Data CentreData center——1.4 km
15MW PV and 5MW Battery grid connectionGrid connection20 MWPlanned2.6 km
Botley - Solar Photovoltaic ArrayPower plant50 MWCancelled3.1 km
Tilbury Farm grid connectionGrid connection49.9 MWPlanned3.3 km
Engine (Combustion / Reciprocating) 11.25 MW grid connection at Cowley LocalGrid connection11.3 MWPlanned4.8 km
BMW UK Manufacturing LtdPower plant3 MWOperating4.9 km
Radley College, Kennington Gate - Solar Array & Battery StoragePower plant2 MWPermitted5.8 km
AWS Didcot Data CentreData center——15 km
R89Data center——20 km