Substation · England, United Kingdom

National Avenue

National Avenue is an 11 kV primary substation in England, United Kingdom, with 17.4 MVA of demand headroom and 1.72 MW of generation headroom, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom17.4 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom1.72 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity24 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimary substationNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromHull SouthNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromCreyke BeckNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)None (green on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7551, -0.3832Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 328 power plants (83 operating, 3,679 MW), 283 grid connections (142 operating, 2,202 MW), 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gas 1.2 MW grid connection at Clarendon StreetGrid connection1.2 MWOperating1.6 km
Hull Royal Infirmary grid connectionGrid connection1.5 MWPlanned2.1 km
Croxby Hall Farm, Inglemire Lane - Solar Farm & Battery StoragePower plant9.71 MWCancelled2.3 km
Snuff Mill Lane Gates - Solar Farm & Battery StoragePower plant9.71 MWCancelled2.5 km
Wind 1.995 MW grid connection at First AvenueGrid connection2 MWOperating3.3 km
Clough Road - Battery Energy SystemPower plant130 MWPermitted3.4 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled5.6 km
Aldbrough Hydrogen StorageGas storage facility—Planned21 km
North Humber to High MarnhamTransmission line—Planned46 km

Grid operator and place