Substation · England, United Kingdom
Diss Grid 11kV Substation
Diss Grid 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 2.7 MVA of demand headroom and 10.2 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 2.7 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 10.2 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 15 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.3723, 1.1061 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 259 power plants (84 operating, 2,416 MW), 180 grid connections (116 operating, 2,077 MW), 3 transmission lines and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Temporis WF Eye Airfield grid connection | Grid connection | 6.8 MW | Operating | 1.5 km |
| Marsh Lane Solar Farm, Lion Road - Solar Farm | Power plant | 30 MW | Permitted | 1.7 km |
| (ANM) Old Bury Road grid connection | Grid connection | 30 MW | Planned | 1.9 km |
| The Grange Solar Farm & Battery Storage | Power plant | 48 MW | Permitted | 2.1 km |
| (ANM) Land North Of A143 grid connection | Grid connection | 48 MW | Planned | 2.2 km |
| EcoPower Suffolk Solar | Power plant | — | Planned | 2.5 km |
| Norwich to Tilbury | Transmission line | — | Planned | 25 km |
| LionLink Interconnector | Transmission line | — | Planned | 35 km |
| US Air Force data center, Brandon | Data center | — | — | 38 km |
Grid operator and place
More from Eastern Power Networks plc
- Canvey Primary 11kVsubstation
- Thorley Primary 11kVsubstation
- Peterborough South Grid 11kVsubstation
- Westbury Primary 11kVsubstation
- Laxfield Primary 11kVsubstation
- Fulbourn Grid 33kVsubstation
- Earlham Grid 33kVsubstation
- Hunstanton Primary 11kVsubstation
Candidate sites around this substation
2 sites of land near Diss Grid 11kV have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 1.51 ha brownfield site at Former Hamlin's Factory site, Diss, South Norfolk0.11 km · score 31
- 2.13 ha brownfield site at Feather Factory site, Diss, South Norfolk0.17 km · score 30
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.