Substation · England, United Kingdom

Camberley Primary

Camberley Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom31.7 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers3 x 20 / 40MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromCamberley (Main) BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromFleet-Bramley GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.3276, -0.7587SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 249 power plants (82 operating, 990 MW), 149 grid connections (77 operating, 806 MW), 111 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data Centre, Dennison House, Stanhope Road - Solar PanelsPower plant1.22 MWUnknown0.6 km
Data Centre, Dennison House, Stanhope Road - Solar PanelsPower plant1.15 MWPermitted0.6 km
Stanhope Road - Solar PanelsPower plant1.22 MWCancelled0.7 km
Gravity Edge LDN1Data center——0.8 km
Asanti - FarnboroughData center——4.4 km
Ark Data Centres data center, EnglandData center——5.8 km
Solar 15.2 MW grid connection at Farnborough 2 GenerationGrid connection15.2 MWOperating6.1 km
Tillingham Power grid connectionGrid connection15.2 MWOperating6.1 km
Barkham PV Farm grid connectionGrid connection20 MWPlanned9.8 km

Grid operator and place

More from Southern Electric Power Distribution plc