Substation · England, United Kingdom

Armouries Drive

Armouries Drive is a substation in England, United Kingdom, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom0 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom29.1 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity30 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimaryNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromLow RoadNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromSkelton GrangeNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)None (rag: Green)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)None (rag: Green)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7907, -1.5300Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 446 grid connections (222 operating, 2,226 MW), 391 power plants (103 operating, 4,003 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Generation 1 MW grid connection at Brookfield StreetGrid connection1 MWOperating0.8 km
Pollington Energy ParkPower plant53 MWCancelled1.1 km
Oil 1.125 MW grid connection at Upper Basinghall StreetGrid connection1.13 MWPlanned1.3 km
Battery storage 200 MW grid connection at Mercury Renewables BESS DirectGrid connection200 MWPlanned1.5 km
Cross Green ERFPower plant11.6 MWOperating1.9 km
Knostrop WWTW ADPower plant2.4 MWOperating2.0 km
Yorkshire GREENTransmission line—Permitted21 km