Substation · Vilshofen an der Donau, Bavaria, Germany

Pleinting substation

Pleinting substation is a 380 kV substation in Vilshofen an der Donau, Bavaria, Germany, operated by TenneT TSO GmbH.

We hold more on this substation.New connections and earliest connection: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBavariaNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
LocationVilshofen an der Donau (point in boundary)BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026
Grid operatorTenneT TSO GmbHNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
New connectionsAvailable on requestTenneT Germany: locations with possible grid connections (Reifegradverfahren) · Restricted · checked 25 Oct 2026
Earliest connectionAvailable on requestTenneT Germany: locations with possible grid connections (Reifegradverfahren) · Restricted · checked 25 Oct 2026
Planned reinforcementSynchronous condenser (1x) (due 2033, transmission network, NEP measure M592g15, project P400, added by this plan, confirmed by the previous plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcement380 kV shunt reactor (1x) (due 2034, transmission network, NEP measure M591g36, project P400, added by this plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcement380 kV shunt reactor (1x) (due 2027, transmission network, NEP measure M591g35, project TTG-018, start grid (approved or under way), confirmed by the previous plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Voltage380 kVNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Voltage380 kV (levels 380, 220 kV)OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates48.6671, 13.1031OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Know more about this substation? Ask us.

Also recorded as

3 sources record Pleinting substation; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.

Name in the sourceIdentifierSourceMatched on
Pleinting substationasset:nep:pleintingNetzentwicklungsplan Strom: point measures (Punktmaßnahmen)—
Umspannwerk Pleintingasset:osm:way-24976300OpenStreetMap power infrastructure (Overpass)Same name and Land
Pleinting substationasset:tennet-de:pleintingTenneT Germany: locations with possible grid connections (Reifegradverfahren)Same name and point

Nearby

Within 50 km of this substation: 55 power plants (42 operating, 1,310 MW) and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
synaforce GmbHData center——1.3 km
Kreuzacker EEGPower plant13.2 MWOperating12 km
AmmerlingPower plant70.2 MWOperating12 km
Lüssen Nord EEGPower plant15.9 MWOperating14 km
WKNJ00Data center——37 km

Grid operator and place

Data centers with this as their nearest transmission substation

More from TenneT TSO GmbH

Other substations in Bavaria

All 762 substations in Bavaria, Germany

Data on this page