Substation · Hesse, Germany
Abzweig Waldeck substation
Abzweig Waldeck substation is a substation in Hesse, Germany, connected by TenneT TSO GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Hesse | Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | TenneT TSO GmbH | Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | Phase-shifting transformer (4x) (due 2028, transmission network, NEP measure M532, project P353, added by this plan, confirmed by the previous plan) | Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Request researchGrid operator and place
More from TenneT TSO GmbH
- Ahlten substationsubstation
- Alfstedtsubstation
- Audorf Südsubstation
- Bechterdissensubstation
- Umspannwerk Bergrheinfeld/Westsubstation
- Umspannwerk Bergshausen 380kVsubstation
- Bleckenstedt/Süd substationsubstation
- Borken 380kVsubstation
Other substations in Hesse
Data on this page
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.