TenneT Germany: locations with possible grid connections (Reifegradverfahren)

The 10 TenneT TSO GmbH substations where connections are possible in the current round of the Reifegradverfahren (Tabelle 1): coordinates (indicative), expected earliest commissioning year for a customer connection, and notes (load only). As of 1 April 2026; no MW figures (Germany). Rare Context derives facts from TenneT Germany: locations with possible grid connections (Reifegradverfahren) under Restricted without republishing the data itself.

About this source

Publisher's pagehttps://www.tennet.eu/de/strommarkt/kunden-deutschland/netzanschlussanfragen
LicenceRestricted
CreditTenneT Germany: locations with possible grid connections (Reifegradverfahren)
Licence termsThe disclaimer (https://www.tennet.eu/de/disclaimer) says: "Der Inhalt dieser Website ist urheberrechtlich geschützt. Die TenneT TSO GmbH gewährt Ihnen jedoch das Recht, den auf dieser Website bereitgestellten Text ganz oder ausschnittsweise zu speichern und zu vervielfältigen" (images and graphics excluded). That grants storing and copying the text, not making it available to the public, so claims are listed until TenneT confirms republication. Checked 2026-10-25.
CoverageGermany
AccessHTML table on the connection request page, behind a Cloudflare bot check that scripts cannot pass: kept by hand in pipeline/collectors/tennet-de-connection-points.json (read 2026-10-25)
RefreshQuarterly

Download

Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.

FileRecordsUpdatedLast checked
substations.jsonl8525 Oct 202625 Oct 2026

Pages built from this source

Substations

We hold more from TenneT Germany: locations with possible grid connections (Reifegradverfahren).50 facts we may not republish, such as new connections, earliest connection and grid operator: available on request.