Powered land · Wakefield, England

67 ha site near South Elmsall substation, Wakefield

A candidate site of 67.1 ha in Wakefield, England: one HM Land Registry INSPIRE title polygon. It touches the South Elmsall substation (Northern Powergrid (Yorkshire) plc), which has 13 MVA of demand headroom and 9.35 MW for generation: most such sites are the station's own land.

Owner, grid capacity and planning status on request.We do not publish owners. Ask us and we look up the registered owner of this title at HM Land Registry, the headroom and connection queue at the nearest substation and the local plan and planning applications, and find out whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area67.1 ha (the area of its INSPIRE polygon, the indicative extent of a registered title)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
INSPIRE polygon54833952 (its id in the HM Land Registry INSPIRE Index Polygons)HM Land Registry INSPIRE Index Polygons · Open Government Licence v3.0 · checked 24 Oct 2026
LocationWakefield, EnglandRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.5853, -1.2863 (a point on the polygon)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationSouth Elmsall (0 km, polygon edge to the substation's mapped point)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Substation operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom at the substation13 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom at the substation9.35 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake) at the substationNone (green on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in) at the substationNone (green on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

The polygon shows where the title lies, not its legal extent: HM Land Registry notes that the extent of a title can only be established from the title plan.

How it compares

Ranked apart: it touches its substation, and most sites that do are the station's own land. Its score would be 62.

PartThis sitePointsOf
Area67.1 ha18.630
Distance to the substation0 km3030
Demand headroom at the substation13 MVA1340
Site score62100

How the site score works in the United Kingdom · Search sites in Wakefield

Nearby sites on the same substation

13 other sites have South Elmsall as nearest substation and would compete for its capacity.