50 ha site at Gemarkung Frankenau, Flurstück 193/2

A candidate site of 50.2 ha in Thuringia, made up of 1 cadastral parcel, mostly farmland. It lies 1.11 km from the 110 kV substation Bethenhausen (Thüringer Energienetze). The nearest transmission substation, Umspannwerk Weida (380 kV), is 19.6 km away, where the grid development plan lists 6 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area50.2 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Frankenau, Flurstück 193/2)ALKIS Thüringen (open cadastre) · CC BY 4.0 · checked 24 Oct 2026
Land useFarmland (Landwirtschaft) (100% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationThuringiaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates50.9244, 12.2149 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationBethenhausen (1.11 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorThüringer EnergienetzeOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Weida (19.6 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Planned at that substationSTATCOM (1x) (due 2026); 380/220 kV grid coupling transformer (1x) (due 2026); 380 kV shunt reactor (1x 176 Mvar) (due 2030); 1 more (Netzentwicklungsplan; 2 more measures available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Water stressHigh (40–80%) (score 3.4 of 5, withdrawals 51.7% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

#145 of 200 sites in Thuringia and #3,762 of 4,863 in Germany by site score. Larger than 13% of the sites in Thuringia. Closer to its substation than 60% of them.

PartThis sitePointsOf
Area50.2 ha15.835
Distance to the substation1.11 km15.635
Substation voltage110 kV1030
Site score41100