Power plant · Neath Port Talbot, Wales, United Kingdom

Rhydypandy Road, Morriston - Battery Energy Storage System

Rhydypandy Road, Morriston - Battery Energy Storage System is a permitted power plant in Neath Port Talbot, Wales, United Kingdom, with 100 MW of capacity, operated by Statkraft UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNeath Port Talbot (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressW/O Rhydypandy Road, Morriston, Swansea, SA6DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Dec 2025 (permit 2025/0855/FUL, Town and Country Planning Act, issued by Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Apr 2025 (reference 2025/0855/FUL, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Dec 2025 (granted, reference 2025/0855/FUL, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorStatkraft UK LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5838, -3.7476DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Rhydypandy Road, Morriston - Battery Energy Storage System is the 35th-largest of 177 power plants planned, permitted or under construction in Wales and the 426th-largest of 3,222 in the United Kingdom by capacity; its 100 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales35th of 17716,801 MW0.6%
United Kingdom426th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,276th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
CGI DatacenterData center——15 km
Centerprise International (Distribution)Data center——36 km
Microsoft Newport data centreData center——49 km

Operator and place

More from Statkraft UK Limited

Other power plants in Wales

All 616 power plants in Wales, United Kingdom