Power plant · Rhondda Cynon Taf, Wales, United Kingdom

Maerdy extension

Maerdy extension is a cancelled power plant in Rhondda Cynon Taf, Wales, United Kingdom, with 3 MW of capacity, operated by Greencoat UK Wind.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRhondda Cynon Taf (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand between Maerdy Coal Tip and Tynewydd ForestDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Dec 2014 (permit 14/0556/10, Town and Country Planning Act, issued by Rhondda Cynon Taf)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 May 2014 (reference 14/0556/10, planning authority Rhondda Cynon Taf)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Dec 2014 (granted, reference 14/0556/10, planning authority Rhondda Cynon Taf)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreencoat UK WindDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units1 units (3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6855, -3.5054DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Rhondda Cynon Taf, reference 14/0556/10)
  2. Permit applied for (planning authority Rhondda Cynon Taf, reference 14/0556/10)

How it compares

Maerdy extension is the 328th-largest of 424 power plants in Wales and the 3,739th-largest of 5,050 in the United Kingdom by capacity; its 3 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales328th of 4249,068 MW<0.1%
United Kingdom3,739th of 5,050115,622 MW<0.1%
All power plants in our data9,677th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Centerprise International (Distribution)Data center——20 km
CGI DatacenterData center——22 km
Centerprise International NewportData center——35 km

Operator and place

More from Greencoat UK Wind

Other power plants in Wales

All 616 power plants in Wales, United Kingdom