Power plant · Swansea, Wales, United Kingdom

Land at Lltty Morphil Farm

Land at Lltty Morphil Farm is a cancelled power plant in Swansea, Wales, United Kingdom, with 5 MW of capacity, operated by Kronos Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSwansea (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLlettyr Morfil Farm, U/S-Y878, Felindre, Swansea, West Glamorgan, SA5 7LUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 May 2016 (permit 2015/1529, Town and Country Planning Act, issued by Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Jul 2015 (reference 2015/1529, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Nov 2015 (refused, reference 2015/1529, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 May 2016 (granted, reference 2015/1529, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 May 2016 (appeal granted, reference 2015/1529, planning authority Swansea)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorKronos SolarDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area8.87 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6928, -3.9559DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (appeal granted, planning authority Swansea, reference 2015/1529)
  2. Permit granted (planning authority Swansea, reference 2015/1529)
  3. Permit refused (planning authority Swansea, reference 2015/1529)
  4. Permit applied for (planning authority Swansea, reference 2015/1529)

How it compares

Land at Lltty Morphil Farm is the 231st-largest of 424 power plants in Wales and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales231st of 4249,068 MW<0.1%
United Kingdom2,742nd of 5,050115,622 MW<0.1%
All power plants in our data8,380th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Brechfa Forest ConnectionTransmission line—Permitted34 km
CGI DatacenterData center——34 km

Operator and place

More from Kronos Solar

Other power plants in Wales

All 616 power plants in Wales, United Kingdom