Power plant · Stroud, England, United Kingdom

Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility

Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility is a cancelled power plant in Stroud, England, United Kingdom, with 49.9 MW of capacity, operated by Kronos Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStroud (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMilton End Farm Arlingham, GL2 7JHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Jun 2022 (reference S.22/1371/FUL, planning authority Stroud)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Dec 2022 (withdrawn, reference S.22/1371/FUL, planning authority Stroud)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorKronos SolarDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area61.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7955, -2.4114DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Stroud, reference S.22/1371/FUL)
  2. Permit applied for (planning authority Stroud, reference S.22/1371/FUL)

How it compares

Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility is the 175th-largest of 3,430 power plants in England and the 362nd-largest of 5,050 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England175th of 3,43071,965 MW<0.1%
United Kingdom362nd of 5,050115,622 MW<0.1%
All power plants in our data1,865th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 70 grid connections (41 operating, 643 MW), 33 substations, 7 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
DXC TechnologyData center——9.9 km
Tetbury PrimarySubstation——25 km
Kemble RAF PrimarySubstation——28 km
Marsh Farm B PV grid connectionGrid connection11.4 MWOperating29 km
Long Newton PV grid connectionGrid connection5.8 MWOperating29 km
Sunstroom grid connectionGrid connection4.28 MWOperating29 km
Alderton PrimarySubstation——30 km
nLighten BristolData center——31 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating33 km

Operator and place

More from Kronos Solar

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page