Power plant · Neath Port Talbot, Wales, United Kingdom
Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System
Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System is a permitted power plant in Neath Port Talbot, Wales, United Kingdom, with 30 MW of capacity, operated by Aldustria Energy Storage.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Neath Port Talbot (coordinates), Wales | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Unit 3, Chosen Park, Lane From Brunel Way To Sewage Pumping Station, Baglan Energy Park, Neath, SA11 2HZ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 19 Jun 2025 (permit P2025/0064, Town and Country Planning Act, issued by Neath Port Talbot) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Feb 2025 (reference P2025/0064, planning authority Neath Port Talbot) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 19 Jun 2025 (granted, reference P2025/0064, planning authority Neath Port Talbot) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Aldustria Energy Storage | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 30 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6276, -3.8220 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Neath Port Talbot, reference P2025/0064)
- Permit applied for (planning authority Neath Port Talbot, reference P2025/0064)
How it compares
Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System is the 80th-largest of 177 power plants planned, permitted or under construction in Wales and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Wales | 80th of 177 | 16,801 MW | 0.18% |
| United Kingdom | 1,569th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,981st of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 2 data centers and 1 transmission line, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| CGI Datacenter | Data center | — | — | 22 km |
| Centerprise International (Distribution) | Data center | — | — | 41 km |
| Brechfa Forest Connection | Transmission line | — | Permitted | 45 km |
Operator and place
More from Aldustria Energy Storage
- Mount Stamper Road, Treverbyn - Battery Energy Storage10 MW · permitted
- St Columb Major - Battery Energy Storage Facility5 MW · permitted
- Link Road - Battery Storage3 MW · permitted
- Town Farm, Blackawton - Battery Storage System3 MW
Other power plants in Wales
- Dinorwig1,728 MW
- Gwynt y Mor576 MW
- Ffestiniog360 MW
- Port Talbot Renewable Energy Plant350 MW
- Anglesey Biomass Power Station299 MW
- Tidal Lagoon Swansea Bay240 MW
- Pen Y Cymoedd228 MW
- Carnedd Wen Wind Farm150 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.