Owner · Company
Aldustria Energy Storage
Aldustria Energy Storage operates 5 power plants in the United Kingdom.
Portfolio
The 5 assets and rights Aldustria Energy Storage owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 5
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System | Neath Port Talbot, Wales, United Kingdom | Operator | 30 MW |
| Mount Stamper Road, Treverbyn - Battery Energy Storage | Cornwall, England, United Kingdom | Operator | 10 MW |
| St Columb Major - Battery Energy Storage Facility | Cornwall, England, United Kingdom | Operator | 5 MW |
| Link Road - Battery Storage | Cornwall, England, United Kingdom | Operator | 3 MW |
| Town Farm, Blackawton - Battery Storage System | South Hams, England, United Kingdom | Operator | 3 MW |
By country
Where the assets and rights are.
- The United Kingdom5 power plants
Latest events
Dated events about Aldustria Energy Storage and its assets from official notices and registers, newest first: the latest 8 of 10. All recent changes.
- Permit granted: Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System (planning authority Neath Port Talbot, reference P2025/0064)
- Permit granted: St Columb Major - Battery Energy Storage Facility (planning authority Cornwall, reference PA25/02638)
- Permit applied for: St Columb Major - Battery Energy Storage Facility (planning authority Cornwall, reference PA25/02638)
- Permit applied for: Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System (planning authority Neath Port Talbot, reference P2025/0064)
- Permit granted: Mount Stamper Road, Treverbyn - Battery Energy Storage (planning authority Cornwall, reference PA24/01713)
- Withdrawn: Town Farm, Blackawton - Battery Storage System (planning authority South Hams, reference 0697/24/FUL)
- Permit applied for: Mount Stamper Road, Treverbyn - Battery Energy Storage (planning authority Cornwall, reference PA24/01713)
- Permit applied for: Town Farm, Blackawton - Battery Storage System (planning authority South Hams, reference 0697/24/FUL)
Research on Aldustria Energy Storage.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.
Request researchData on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.