Power plant · East Dunbartonshire, Scotland, United Kingdom
Whitehall Battery Storage
Whitehall Battery Storage is a permitted power plant in East Dunbartonshire, Scotland, United Kingdom, with 560 MW of capacity, operated by Apatura.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Dunbartonshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Cochno Road, East Bearsden, G81 5QS | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 22 Jul 2025 (permit ECU00004982, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 16 Nov 2023 (reference ECU00004982, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 22 Jul 2025 (granted, reference ECU00004982, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Apatura | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 560 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.9373, -4.3826 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Scottish Government (S36), reference ECU00004982)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00004982)
How it compares
Whitehall Battery Storage is the 31st-largest of 872 power plants planned, permitted or under construction in Scotland and the 98th-largest of 3,222 in the United Kingdom by capacity; its 560 MW is 0.19% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 31st of 872 | 99,272 MW | 0.56% |
| United Kingdom | 98th of 3,222 | 300,461 MW | 0.19% |
| All power plants planned, permitted or under construction in our data | 221st of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 23 substations, 22 grid connections (12 operating, 243 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| DataVita DV2 | Data center | — | — | 11 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 11 km |
| iomart Glasgow Data Centre | Data center | — | — | 11 km |
| Strathleven GSP | Substation | — | — | 11 km |
| Killearn Primary | Substation | — | — | 13 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 13 km |
| Auchincarroch (GEN464G2) grid connection | Grid connection | 1.01 MW | Operating | 13 km |
| Drymen Primary | Substation | — | — | 14 km |
| Ross Priory Hydro grid connection | Grid connection | 4 MW | Planned | 17 km |
Operator and place
More from Apatura
- Glenside Farm - Battery Storage400 MW · permitted
- Neilston - Battery Storage150 MW · permitted
- Balnuith Farm, Tealing - Battery Storage100 MW · permitted
- Kilwinning Battery Storage100 MW · permitted
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.