Power plant · Angus, Scotland, United Kingdom

Balnuith Farm, Tealing - Battery Storage

Balnuith Farm, Tealing - Battery Storage is a permitted power plant in Angus, Scotland, United Kingdom, with 100 MW of capacity, operated by Apatura.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAngus (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBalnuith Farm, Tealing, Dundee, DD4 0REDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Oct 2024 (permit ECU00004887, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Nov 2023 (reference ECU00004887, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Oct 2024 (granted, reference ECU00004887, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorApaturaDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.5298, -2.9766DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Scottish Government (S36), reference ECU00004887)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00004887)

How it compares

Balnuith Farm, Tealing - Battery Storage is the 146th-largest of 872 power plants planned, permitted or under construction in Scotland and the 426th-largest of 3,222 in the United Kingdom by capacity; its 100 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland146th of 87299,272 MW0.1%
United Kingdom426th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,276th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 93 grid connections (27 operating, 396 MW) and 69 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
West Kirkton PrimarySubstation——4.2 km
Leoch PrimarySubstation——4.4 km
MacAlpine Road PrimarySubstation——4.7 km
With CCM grid connectionGrid connection36.7 MWPlanned4.8 km
49.9MW Battery Storage grid connectionGrid connection49.9 MWPlanned5.1 km
Midmill Gasholder Station grid connectionGrid connection49.9 MWPlanned5.7 km

Operator and place

More from Apatura

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page