Power plant · North Lanarkshire, Scotland, United Kingdom

Newhouse, Biggar Road -Solar Array

Newhouse, Biggar Road -Solar Array is a planned power plant in North Lanarkshire, Scotland, United Kingdom, with 3.5 MW of capacity, operated by Ampyr Distribution Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Lanarkshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBiggar Road Newarthill, ML1 5SSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Mar 2026 (reference 26/00190/FUL, planning authority North Lanarkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAmpyr Distribution Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area7.75 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.8236, -3.9265DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority North Lanarkshire, reference 26/00190/FUL)

How it compares

Newhouse, Biggar Road -Solar Array is the 684th-largest of 742 power plants planned, permitted or under construction in Scotland and the 2,165th-largest of 2,549 in the United Kingdom by capacity; its 3.5 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland684th of 74293,216 MW<0.1%
United Kingdom2,165th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data5,323rd of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 12 data centers, 12 grid connections (5 operating, 37.4 MW) and 11 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
DataVita DV1Data center——2.0 km
Asanti HamiltonData center——12 km
DataVita DV2Data center——22 km
Generating Station grid connectionGrid connection21.4 MWOperating28 km
Shelloch B Wind Farm grid connectionGrid connection25 MWPlanned35 km
Patrickston Farm - PV + Battery grid connectionGrid connection15.9 MWPlanned36 km
Kippen PrimarySubstation——37 km
Killearn PrimarySubstation——38 km
Kepculloch PrimarySubstation——40 km

Operator and place