Power plant · Renfrewshire, Scotland, United Kingdom
Neilston Greener Grid Park
Neilston Greener Grid Park is a power plant under construction in Renfrewshire, Scotland, United Kingdom, with 50 MW of capacity, operated by Statkraft UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Renfrewshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Site 400 metres North West of Sergeantlaw, Gleniffer Road, Paisley, PA1 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 28 Apr 2022 (permit 21/0034/PP, Town and Country Planning Act, issued by Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 21 Jan 2021 (reference 21/0034/PP, planning authority Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Apr 2022 (appeal granted, reference 21/0034/PP, planning authority Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 5 Nov 2021 (refused, reference 21/0034/PP, planning authority Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Apr 2022 (granted, reference 21/0034/PP, planning authority Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Statkraft UK Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 50 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.8469, -4.4242 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Neilston Greener Grid Park is the 285th-largest of 872 power plants planned, permitted or under construction in Scotland and the 755th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 285th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 755th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,832nd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 20 substations, 14 grid connections (9 operating, 223 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| iomart Glasgow Data Centre | Data center | — | — | 8.8 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 9.8 km |
| DataVita DV2 | Data center | — | — | 10 km |
| Strathleven GSP | Substation | — | — | 15 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 19 km |
| Auchincarroch (GEN464G2) grid connection | Grid connection | 1.01 MW | Operating | 19 km |
| Blairlinnans Primary | Substation | — | — | 22 km |
| Killearn Primary | Substation | — | — | 23 km |
| Ross Priory Hydro grid connection | Grid connection | 4 MW | Planned | 24 km |
Operator and place
More from Statkraft UK Limited
- Neilston Greener Grid Park - Phase 2750 MW · permitted
- East Claydon Substation, East Claydon Road - Energy Storage500 MW · planned
- Stargoose Farm - Battery Storage312 MW · permitted
- Soay Solar Farm and Greener Grid Park200 MW · under construction
- Spennymoor Greener Grid Park200 MW · permitted
- Rhydypandy Road, Morriston - Battery Energy Storage System100 MW · permitted
- An Carr Dubh Wind Farm85.8 MW · planned
- Carn Fearna Wind Farm84.6 MW · planned
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.