Power plant · Aberdeenshire, Scotland, United Kingdom
Mid Hill - Phase II
Mid Hill - Phase II is a power plant in Aberdeenshire, Scotland, United Kingdom, with 18.4 MW of capacity, operated by Fred Olsen Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Aberdeenshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Mid Hill, Fetteresso Stonehaven | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2014 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 3 Jun 2005 (permit SO30179PF, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 12 Feb 2003 (ref. SO30179PF, Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 3 Jun 2005 (granted, ref. SO30179PF, Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Fred Olsen Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 18.4 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 8 units | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 56.9704, -2.4830 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Mid Hill - Phase II is the 474th-largest of 1,196 power plants in Scotland and the 1,221st-largest of 5,050 in the United Kingdom by capacity; its 18.4 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 474th of 1,196 | 34,589 MW | <0.1% |
| United Kingdom | 1,221st of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 4,252nd of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Electricity Act 1989 section 36), no. SO30179PF
- Started operating
Nearby
Within 50 km of this power plant: 111 grid connections (37 operating, 347 MW) and 78 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| MID Hill Wind Farm grid connection | Grid connection | 71.3 MW | Operating | 5.0 km |
| Wind 44.5 MW grid connection at Fettersso Grid | Grid connection | 44.5 MW | Planned | 6.3 km |
| The Waters BESS grid connection | Grid connection | 55 MW | Planned | 6.8 km |
| Fetteresso GSP | Substation | — | — | 8.3 km |
| Banchory Primary | Substation | — | — | 9.7 km |
| Fiddes GSP | Substation | — | — | 12 km |
Operator and place
More from Fred Olsen Renewables
- Crystal Rig Wind Farm Phase 2a138 MW
- Rothes Wind Farm III132 MW · permitted
- Brochloch Rig (formerly Windy Standard II)90 MW
- Windy Standard III Wind Farm (Brockloch Rig Phase 2)87.6 MW · under construction
- Crystal Rig Phase 1 Repowering72 MW · planned
- Paul's Hill and Extension65 MW
- Crystal Rig Phase 162.5 MW
- Mid Hill I57.5 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.