Power plant · Perth and Kinross, Scotland, United Kingdom

Mellock Hill Wind Farm II

Mellock Hill Wind Farm II is a cancelled power plant in Perth and Kinross, Scotland, United Kingdom, with 35 MW of capacity, operated by Renewable Development Company Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressOchill Hills, nr. Crook of Devon PerthshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Aug 2005 (planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 May 2006 (withdrawn, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRenewable Development Company LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity35 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units14 units (2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.2425, -3.5720DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Mellock Hill Wind Farm II is the 270th-largest of 1,196 power plants in Scotland and the 651st-largest of 5,050 in the United Kingdom by capacity; its 35 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland270th of 1,19634,589 MW0.1%
United Kingdom651st of 5,050115,642 MW<0.1%
All power plants in our data2,507th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 72 grid connections (26 operating, 416 MW), 56 substations and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Glendevon PrimarySubstation——4.7 km
Findony grid connectionGrid connection2 MWOperating6.6 km
Shire End 20MW PV grid connectionGrid connection20 MWPlanned7.5 km
Milnathort PrimarySubstation——9.3 km
Forteviot PrimarySubstation——12 km
Lochebank Windfarm grid connectionGrid connection9.45 MWOperating12 km
Edinburgh SC-3Data center——36 km
Pulsant Edinburgh SC-1Data center——39 km
Pulsant Edinburgh South Gyle SC-1Data center——39 km