Power plant · Dumfries and Galloway, Scotland, United Kingdom

Lowther Hills (North Lowther Energy Initiative) Wind Farm

Lowther Hills (North Lowther Energy Initiative) Wind Farm is a cancelled wind power plant in Dumfries and Galloway, Scotland, United Kingdom, with 147 MW of capacity, operated by Buccleuch) and Forsa.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDumfries and Galloway (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Addressnear Wanlockhead and the Muirkirk and North Lowther Uplands special protection areaDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Jun 2017 (reference ECU00000426, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jan 2021 (refused, reference ECU00000426, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jan 2023 (appeal refused, reference ECU00000426, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBuccleuch) (Forsa (formerly 2020 Renewables/ Buccleuch), applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorForsa (Forsa (formerly 2020 Renewables/ Buccleuch), applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity147 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units30 units (4.2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.4176, -3.8398DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Scottish Government (S36), reference ECU00000426)
  2. Permit refused (planning authority Scottish Government (S36), reference ECU00000426)
  3. Permit applied for (planning authority Scottish Government (S36), reference ECU00000426)

How it compares

Lowther Hills (North Lowther Energy Initiative) is the 42nd-largest of 1,340 power plants in Scotland and the 183rd-largest of 5,834 in the United Kingdom by capacity; its 147 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland42nd of 1,34046,467 MW0.32%
United Kingdom183rd of 5,834200,500 MW<0.1%
All power plants in our data2,129th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 2 data centers, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Asanti HamiltonData center——44 km
DataVita DV1Data center——47 km

Operators and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page