Power plant · South Lanarkshire, Scotland, United Kingdom
Lochhead Farm
Lochhead Farm is a power plant in South Lanarkshire, Scotland, United Kingdom, with 6 MW of capacity, operated by Green Energy and A7 Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Lanarkshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land at Lochhead Farm , Stonehouse | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2009 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 1 May 2006 (permit HM/05/0147, Town and Country Planning Act, issued by South Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 1 Apr 2005 (reference HM/05/0147, planning authority South Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 1 May 2006 (granted, reference HM/05/0147, planning authority South Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Green Energy (A7 Energy / Green Energy) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | A7 Energy (A7 Energy / Green Energy) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 6 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 3 units (2 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.6973, -3.9797 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Lochhead Farm is the 728th-largest of 1,196 power plants in Scotland and the 2,545th-largest of 5,050 in the United Kingdom by capacity; its 6 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 728th of 1,196 | 34,589 MW | <0.1% |
| United Kingdom | 2,545th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 8,079th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. HM/05/0147
- Started operating
Nearby
Within 50 km of this power plant: 9 data centers, 5 grid connections (3 operating, 25.4 MW) and 5 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Asanti Hamilton | Data center | — | — | 12 km |
| DataVita DV1 | Data center | — | — | 15 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 25 km |
| Generating Station grid connection | Grid connection | 21.4 MW | Operating | 40 km |
| Strathleven GSP | Substation | — | — | 47 km |
| Shelloch B Wind Farm grid connection | Grid connection | 25 MW | Planned | 47 km |
| Killearn Primary | Substation | — | — | 47 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 49 km |
| Drymen Primary | Substation | — | — | 49 km |
Operators and place
More from Green Energy
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.