Power plant · Perth and Kinross, Scotland, United Kingdom
Jamesfield Organic Centre - Battery Storage
Jamesfield Organic Centre - Battery Storage is a power plant in Perth and Kinross, Scotland, United Kingdom, with 49 MW of capacity, operated by Harmony Energy Storage.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Perth and Kinross (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | 140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar, KY14 6EW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2024 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 28 Sept 2022 (permit 22/00832/FLM, Town and Country Planning Act, issued by Perth and Kinross) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 20 May 2022 (ref. 22/00832/FLM, Perth and Kinross) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Sept 2022 (granted, ref. 22/00832/FLM, Perth and Kinross) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Harmony Energy Storage | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 56.3492, -3.2955 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Jamesfield Organic Centre - Battery Storage is the 183rd-largest of 1,196 power plants in Scotland and the 471st-largest of 5,050 in the United Kingdom by capacity; its 49 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 183rd of 1,196 | 34,589 MW | 0.14% |
| United Kingdom | 471st of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 1,960th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 22/00832/FLM
- Started operating
Nearby
Within 50 km of this power plant: 92 grid connections (28 operating, 407 MW) and 66 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Balgonie Farm BESS 49.9MW grid connection | Grid connection | 50 MW | Planned | 0.2 km |
| Balgonie Farm grid connection | Grid connection | 120 MW | Planned | 0.2 km |
| Jamesfield Farm Battery Storage 1 grid connection | Grid connection | 31.6 MW | Operating | 0.2 km |
| Abernethy Primary | Substation | — | — | 1.0 km |
| Abernethy GSP | Substation | — | — | 1.0 km |
| Errol Primary | Substation | — | — | 5.8 km |
Operator and place
More from Harmony Energy Storage
- Flushing, Longside - Battery Energy Storage System400 MW · planned
- Barn Farm - Batter Energy Storage Facility200 MW · permitted
- Moat Lane, Wickersley - Battery Storage Facility100 MW · permitted
- Clay Tye Farm Phase 1 - Storage Facility49.5 MW
- Clay Tye Farm Phase 2 - Storage Facility49.5 MW
- Station Road49.5 MW
- Pillswood Phase 149.5 MW
- Tollgate Farm Battery Storage49.5 MW · under construction
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.