Power plant · Aberdeenshire, Scotland, United Kingdom

Hill of Blairfowl Solar Farm

Hill of Blairfowl Solar Farm is a cancelled power plant in Aberdeenshire, Scotland, United Kingdom, with 1.5 MW of capacity, operated by Green Cat Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand To The North Of St Johns, Fyvie, Turriff, Grampian, AB53 8PXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date7 Aug 2015 (permit APP/2015/1819, Town and Country Planning Act, issued by Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jun 2015 (reference APP/2015/1819, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Aug 2015 (granted, reference APP/2015/1819, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Cat RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area1.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.4309, -2.3392DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Aberdeenshire, reference APP/2015/1819)
  3. Permit applied for (planning authority Aberdeenshire, reference APP/2015/1819)

How it compares

Hill of Blairfowl Solar Farm is the 1,096th-largest of 1,196 power plants in Scotland and the 4,531st-largest of 5,050 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland1,096th of 1,19634,589 MW<0.1%
United Kingdom4,531st of 5,050115,622 MW<0.1%
All power plants in our data11,084th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 141 grid connections (60 operating, 392 MW), 83 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Phase 2 Windfarm grid connectionGrid connection2.28 MWOperating1.5 km
St JOHNS Wells Wind grid connectionGrid connection2.28 MWOperating1.5 km
Denhill Wind Turbine grid connectionGrid connection2.19 MWOperating2.4 km
Fyvie PrimarySubstation——3.0 km
Methlick PrimarySubstation——5.7 km
Oldmeldrum PrimarySubstation——11 km
BrightsolidData center——33 km

Operator and place

More from Green Cat Renewables

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page