Gretna Green Battery Storage is a permitted power plant in Dumfries and Galloway, Scotland, United Kingdom, with 456 MW of capacity, operated by Gresham House Devco Pipeline.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDumfries and Galloway (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSouth of Gretna 400kv Substation, Gretna, DG16 5HRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Mar 2025 (permit ECU00004986, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Apr 2024 (reference ECU00004986, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Mar 2025 (granted, reference ECU00004986, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGresham House Devco PipelineDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity456 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.0297, -3.0517DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Scottish Government (S36), reference ECU00004986)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00004986)

How it compares

Gretna Green Battery Storage is the 46th-largest of 872 power plants planned, permitted or under construction in Scotland and the 149th-largest of 3,222 in the United Kingdom by capacity; its 456 MW is 0.15% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland46th of 87299,272 MW0.46%
United Kingdom149th of 3,222300,461 MW0.15%
All power plants planned, permitted or under construction in our data318th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 65 grid connections (30 operating, 373 MW), 32 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Beck Burn Wind Farm grid connectionGrid connection31.1 MWOperating3.0 km
Burnfoot Farm grid connectionGrid connection45 MWPlanned6.2 km
Hespin Wood Landfill grid connectionGrid connection1.33 MWOperating8.8 km
WestlintonSubstation——9.4 km
EastonSubstation——11 km
Harker / Hutton GSPSubstation——11 km
Cross Border Connection (England)Transmission line—Planned21 km