Power plant · North Lanarkshire, Scotland, United Kingdom

Glenhead Farm Lower Solar Array

Glenhead Farm Lower Solar Array is a cancelled power plant in North Lanarkshire, Scotland, United Kingdom, with 4.1 MW of capacity, operated by Environmental Energy Investments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Lanarkshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGlenhead Farm, High Banton Road, Kilsyth, Banton, Glasgow, Strathclyde, Scotland, G65 0RBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Jul 2016 (permit 15/02232/FUL, Town and Country Planning Act, issued by North Lanarkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Oct 2015 (reference 15/02232/FUL, planning authority North Lanarkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jul 2016 (granted, reference 15/02232/FUL, planning authority North Lanarkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnvironmental Energy Investments (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area8.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.9831, -4.0147DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority North Lanarkshire, reference 15/02232/FUL)
  3. Permit applied for (planning authority North Lanarkshire, reference 15/02232/FUL)

How it compares

Glenhead Farm Lower Solar Array is the 944th-largest of 1,326 power plants in Scotland and the 3,958th-largest of 5,723 in the United Kingdom by capacity; its 4.1 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland944th of 1,32640,645 MW<0.1%
United Kingdom3,958th of 5,723136,106 MW<0.1%
All power plants in our data9,733rd of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 20 grid connections (10 operating, 74 MW), 20 substations and 12 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Generating Station grid connectionGrid connection21.4 MWOperating11 km
Shelloch B Wind Farm grid connectionGrid connection25 MWPlanned17 km
DataVita DV1Data center——17 km
Patrickston Farm - PV + Battery grid connectionGrid connection15.9 MWPlanned18 km
Kippen PrimarySubstation——19 km
DataVita DV2Data center——21 km
Verizon Glasgow GLSGGBData center——21 km
Dunblane PrimarySubstation——23 km
Kepculloch PrimarySubstation——24 km

Operator and place

More from Environmental Energy Investments