Power plant · Aberdeenshire, Scotland, United Kingdom
Frodo Solar and Battery Energy Development
Frodo Solar and Battery Energy Development is a permitted battery storage plant in Aberdeenshire, Scotland, United Kingdom, with 50 MW of capacity, operated by Green Energy International.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Aberdeenshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Frodo Solar Farm, Crimond, Fraserburgh, AB43 8QH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 16 May 2023 (permit ECU00003345, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 16 Mar 2022 (reference ECU00003345, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 16 May 2023 (granted, reference ECU00003345, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Green Energy International (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 50 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.6030, -1.9118 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Scottish Government (S36), reference ECU00003345)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00003345)
How it compares
Frodo Solar and Battery Energy Development is the 268th-largest of 742 power plants planned, permitted or under construction in Scotland and the 691st-largest of 2,549 in the United Kingdom by capacity; its 50 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 268th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 691st of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,768th of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 89 grid connections (45 operating, 200 MW) and 39 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 5MW Greenside Wind Farm grid connection | Grid connection | 5 MW | Planned | 1.6 km |
| 9MW WIND grid connection | Grid connection | 9 MW | Planned | 1.6 km |
| Frodo & Bilbo Farm Solar/BESS grid connection | Grid connection | 74.6 MW | Planned | 1.6 km |
| St Fergus GSP | Substation | — | — | 4.6 km |
| Mintlaw Primary | Substation | — | — | 9.4 km |
| Strichen GSP | Substation | — | — | 9.6 km |
Operator and place
More from Green Energy International
- Frodo Solar and Battery Energy Development60.1 MW · permitted
- Caudwell Farm, Hollbeach - Solar Array49.9 MW · permitted
- Bilbo Solar Farm Energy Storage40 MW · under construction
- Jockstown Farm Solar Farm37.9 MW
- Bilbo Solar Farm36.6 MW · under construction
- Patrickston Farm15 MW
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.