Power plant · Aberdeenshire, Scotland, United Kingdom

Frodo Solar and Battery Energy Development

Frodo Solar and Battery Energy Development is a permitted battery storage plant in Aberdeenshire, Scotland, United Kingdom, with 50 MW of capacity, operated by Green Energy International.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFrodo Solar Farm, Crimond, Fraserburgh, AB43 8QHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 May 2023 (permit ECU00003345, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Mar 2022 (reference ECU00003345, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 May 2023 (granted, reference ECU00003345, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Energy International (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.6030, -1.9118DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Scottish Government (S36), reference ECU00003345)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00003345)

How it compares

Frodo Solar and Battery Energy Development is the 268th-largest of 742 power plants planned, permitted or under construction in Scotland and the 691st-largest of 2,549 in the United Kingdom by capacity; its 50 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland268th of 74293,216 MW<0.1%
United Kingdom691st of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data1,768th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 89 grid connections (45 operating, 200 MW) and 39 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
5MW Greenside Wind Farm grid connectionGrid connection5 MWPlanned1.6 km
9MW WIND grid connectionGrid connection9 MWPlanned1.6 km
Frodo & Bilbo Farm Solar/BESS grid connectionGrid connection74.6 MWPlanned1.6 km
St Fergus GSPSubstation——4.6 km
Mintlaw PrimarySubstation——9.4 km
Strichen GSPSubstation——9.6 km

Operator and place

More from Green Energy International

Other power plants in Scotland

All 2107 power plants in Scotland, United Kingdom

Data on this page