Power plant · Aberdeenshire, Scotland, United Kingdom

Bilbo Solar Farm

Bilbo Solar Farm is a power plant under construction in Aberdeenshire, Scotland, United Kingdom, with 36.6 MW of capacity, operated by Green Energy International.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, AB43 8QJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Nov 2019 (permit APP/2019/0296, Town and Country Planning Act, issued by Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Jun 2019 (reference APP/2019/0296, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Nov 2019 (granted, reference APP/2019/0296, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Energy InternationalDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity36.6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area50.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.5912, -1.9092DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Aberdeenshire, reference APP/2019/0296)
  3. Permit applied for (planning authority Aberdeenshire, reference APP/2019/0296)

How it compares

Bilbo Solar Farm is the 474th-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,468th-largest of 3,222 in the United Kingdom by capacity; its 36.6 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland474th of 87299,272 MW<0.1%
United Kingdom1,468th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,714th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 91 grid connections (46 operating, 250 MW) and 42 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
5MW Greenside Wind Farm grid connectionGrid connection5 MWPlanned1.1 km
9MW WIND grid connectionGrid connection9 MWPlanned1.1 km
Frodo & Bilbo Farm Solar/BESS grid connectionGrid connection74.6 MWPlanned1.8 km
St Fergus GSPSubstation——3.7 km
Mintlaw PrimarySubstation——8.4 km
Strichen GSPSubstation——9.6 km