Power plant · Stirling, Scotland, United Kingdom

Easter Cringate Cottage, Polmaise Road - Wind Turbines

Easter Cringate Cottage, Polmaise Road - Wind Turbines is a planned power plant in Stirling, Scotland, United Kingdom, with 30 MW of capacity, operated by Drummarnock Wind Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStirling (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address1340M South East Of Easter Cringate Cottage Polmaise Road Fintry, FK8 2DDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Aug 2024 (reference 24/00494/FUL, planning authority Stirling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDrummarnock Wind Farm LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units4 units (7.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.1197, -3.9335DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Stirling, reference 24/00494/FUL)

How it compares

Easter Cringate Cottage, Polmaise Road - Wind Turbines is the 501st-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland501st of 87299,272 MW<0.1%
United Kingdom1,569th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 48 grid connections (20 operating, 216 MW), 35 substations and 12 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Dunblane PrimarySubstation——8.2 km
Patrickston Farm - PV + Battery grid connectionGrid connection15.9 MWPlanned10 km
Kippen PrimarySubstation——14 km
Windburn Wind Farm 75MW Wind, 35MW BESS grid connectionGrid connection110 MWPlanned15 km
Generating Station grid connectionGrid connection21.4 MWOperating15 km
Braco West GSPSubstation——16 km
DataVita DV1Data center——32 km
DataVita DV2Data center——35 km
Verizon Glasgow GLSGGBData center——36 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page