Power plant · North Lanarkshire, Scotland, United Kingdom
Dalmacoulter Landfill, Dalmacoulter Road - Solar Farm
Dalmacoulter Landfill, Dalmacoulter Road - Solar Farm is a permitted solar power plant in North Lanarkshire, Scotland, United Kingdom, with 1 MW of capacity, operated by North Lanarkshire Council.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Lanarkshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Dalmacoulter Landfill, Dalmacoulter Road, Airdrie, ML6 7UD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 22 Apr 2026 (permit 25/00844/FUL, Town and Country Planning Act, issued by North Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Aug 2025 (reference 25/00844/FUL, planning authority North Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 22 Apr 2026 (granted, reference 25/00844/FUL, planning authority North Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | North Lanarkshire Council (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 6.76 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.8819, -3.9645 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority North Lanarkshire, reference 25/00844/FUL)
- Permit applied for (planning authority North Lanarkshire, reference 25/00844/FUL)
How it compares
Dalmacoulter Landfill, Dalmacoulter Road - Solar Farm is the 730th-largest of 742 power plants planned, permitted or under construction in Scotland and the 2,457th-largest of 2,548 in the United Kingdom by capacity; its 1 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 730th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 2,457th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,708th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 15 grid connections (6 operating, 45 MW), 13 substations and 12 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| DataVita DV1 | Data center | — | — | 5.3 km |
| Asanti Hamilton | Data center | — | — | 14 km |
| DataVita DV2 | Data center | — | — | 19 km |
| Generating Station grid connection | Grid connection | 21.4 MW | Operating | 22 km |
| Shelloch B Wind Farm grid connection | Grid connection | 25 MW | Planned | 28 km |
| Patrickston Farm - PV + Battery grid connection | Grid connection | 15.9 MW | Planned | 29 km |
| Kippen Primary | Substation | — | — | 30 km |
| Killearn Primary | Substation | — | — | 32 km |
| Kepculloch Primary | Substation | — | — | 34 km |
Operator and place
More from North Lanarkshire Council
- Auchinlea Landfill Site, Carlisle Road - Solar Array2 MW · planned
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.