Power plant · Aberdeenshire, Scotland, United Kingdom
Clashindarroch Wind Farm Extension
Clashindarroch Wind Farm Extension is a permitted power plant in Aberdeenshire, Scotland, United Kingdom, with 50 MW of capacity, operated by Infinergy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Aberdeenshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Cabrach Estate, approximately 8km south east of Dufftown, 9km south west of Huntly, and 7.5km north west of Rhynie, AB54 4QS | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 18 Dec 2025 (permit ECU00004695, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 13 Jan 2023 (reference ECU00004695, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 18 Dec 2025 (granted, reference ECU00004695, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Infinergy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 50 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.3737, -2.8558 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Clashindarroch Wind Farm Extension is the 285th-largest of 872 power plants planned, permitted or under construction in Scotland and the 755th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 285th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 755th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,832nd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 119 grid connections (54 operating, 558 MW), 67 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wheedlemont Wind grid connection | Grid connection | 1.62 MW | Operating | 5.3 km |
| Clashindarroch Wind Farm 2 - Addcap grid connection | Grid connection | 77 MW | Planned | 6.9 km |
| Cairnmore Wind Park grid connection | Grid connection | 7.27 MW | Operating | 7.3 km |
| Huntly Primary | Substation | — | — | 8.5 km |
| Cairnford GSP | Substation | — | — | 8.7 km |
| Mossat Primary | Substation | — | — | 12 km |
| Brightsolid | Data center | — | — | 49 km |
Operator and place
More from Infinergy
- Dorenell Wind Farm (Previously Site A and B Scaut Hill)177 MW
- Hill of Fare Wind Farm150 MW
- Clashindarroch Wind Farm Extension139 MW · permitted
- Shepherd's Rig Wind Farm81 MW · permitted
- Limekiln Wind Farm79.8 MW
- Limekiln, Borlum House - Battery Energy Storage System70 MW · planned
- Loch Toftingall, Halsary Wind Farm - Battery Energy Storage49.9 MW · permitted
- Tom Nan Clach39 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.