Power plant · North Lanarkshire, Scotland, United Kingdom
Brew Dog Brewery, Condor Glen - Solar Panels
Brew Dog Brewery, Condor Glen - Solar Panels is a cancelled solar power plant in North Lanarkshire, Scotland, United Kingdom, with 1.3 MW of capacity, operated by Scottish Power Pension Fund.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Lanarkshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Brew Dog Brewery Company Ltd 2 Condor Glen Eurocentral Holytown, ML1 4UY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission granted, permission expired) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 18 May 2023 (permit 23/00344/FUL, Town and Country Planning Act, issued by North Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 26 Apr 2023 (reference 23/00344/FUL, planning authority North Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 18 May 2023 (granted, reference 23/00344/FUL, planning authority North Lanarkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Scottish Power Pension Fund (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 1.21 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.8245, -3.9842 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority North Lanarkshire, reference 23/00344/FUL)
- Permit applied for (planning authority North Lanarkshire, reference 23/00344/FUL)
How it compares
Brew Dog Brewery, Condor Glen - Solar Panels is the 1,268th-largest of 1,340 power plants in Scotland and the 5,419th-largest of 5,834 in the United Kingdom by capacity; its 1.3 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 1,268th of 1,340 | 46,467 MW | <0.1% |
| United Kingdom | 5,419th of 5,834 | 200,500 MW | <0.1% |
| All power plants in our data | 15,097th of 15,800 | 1,923,633 MW | <0.1% |
Nearby
Within 50 km of this power plant: 12 data centers, 12 substations and 11 grid connections (5 operating, 37.4 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| DataVita DV1 | Data center | — | — | 2.3 km |
| Asanti Hamilton | Data center | — | — | 8.8 km |
| DataVita DV2 | Data center | — | — | 18 km |
| Generating Station grid connection | Grid connection | 21.4 MW | Operating | 27 km |
| Shelloch B Wind Farm grid connection | Grid connection | 25 MW | Planned | 33 km |
| Patrickston Farm - PV + Battery grid connection | Grid connection | 15.9 MW | Planned | 35 km |
| Killearn Primary | Substation | — | — | 36 km |
| Kippen Primary | Substation | — | — | 36 km |
| Kepculloch Primary | Substation | — | — | 38 km |
Operator and place
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.