Power plant · Clackmannanshire, Scotland, United Kingdom

Bankhead Farm - Energy Storage System

Bankhead Farm - Energy Storage System is a permitted battery storage plant in Clackmannanshire, Scotland, United Kingdom, with 25 MW of capacity, operated by Low Carbon Storage.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationClackmannanshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBankhead Farm, Fishcross, Alloa, FK10 3ANDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 May 2024 (permit 24/00001/FULL, Town and Country Planning Act, issued by Clackmannanshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jan 2024 (reference 24/00001/FULL, planning authority Clackmannanshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 May 2024 (granted, reference 24/00001/FULL, planning authority Clackmannanshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLow Carbon Storage (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.1438, -3.7737DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Clackmannanshire, reference 24/00001/FULL)
  2. Permit applied for (planning authority Clackmannanshire, reference 24/00001/FULL)

How it compares

Bankhead Farm - Energy Storage System is the 486th-largest of 742 power plants planned, permitted or under construction in Scotland and the 1,465th-largest of 2,548 in the United Kingdom by capacity; its 25 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland486th of 74293,216 MW<0.1%
United Kingdom1,465th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data3,118th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 46 grid connections (18 operating, 219 MW), 33 substations and 12 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Windburn Wind Farm 75MW Wind, 35MW BESS grid connectionGrid connection110 MWPlanned11 km
Glendevon PrimarySubstation——12 km
Highland Spring Group grid connectionGrid connection5.5 MWPlanned13 km
Dunblane PrimarySubstation——13 km
Kierallan Farm Solar & Storage 50MW grid connectionGrid connection50 MWPlanned14 km
Gleneagles PrimarySubstation——16 km
Edinburgh SC-3Data center——33 km
Sungard Availability ServicesData center——35 km
DataVita DV1Data center——36 km

Operator and place

More from Low Carbon Storage

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page