Substation · Scotland, United Kingdom

Leoch Primary

Leoch Primary is a 33 kV primary substation in Scotland, United Kingdom, with 3.99 MVA of demand headroom and 0 MW of generation headroom, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotlandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom3.99 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers1 x 6.3MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromCoupar Angus GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by substation thermal capacity & upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.5143, -3.0425SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 236 power plants (49 operating, 825 MW) and 92 grid connections (26 operating, 392 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
49.9MW Battery Storage grid connectionGrid connection49.9 MWPlanned0.8 km
Templeton Farm, Templeton - Battery StoragePower plant49.9 MWPermitted1.1 km
With CCM grid connectionGrid connection36.7 MWPlanned1.6 km
Charleston Solar 20MW PV grid connectionGrid connection20 MWPlanned1.8 km
Pyotdykes Farm, Stoneygroves, Liff - Solar FarmPower plant28 MWPermitted2.8 km
Dunsinane Industrial EstatePower plant49.9 MWOperating4.1 km

Grid operator and place

Grid connections attached to this substation

More from Scottish Hydro Electric Power Distribution plc

Other substations in Scotland

All 453 substations in Scotland, United Kingdom