Power plant · Windsor and Maidenhead, England, United Kingdom

Wraysbury Landfill

Wraysbury Landfill is a power plant in Windsor and Maidenhead, England, United Kingdom, with 4.8 MW of capacity, operated by Sirius Solar Building.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWindsor and Maidenhead (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFormer Wraysbury Landfill, Adj Staines Road, Wraysbury, Staines, Middlesex, TW19 5BSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Oct 2014 (permit 14/02044/FULL, Town and Country Planning Act, issued by Windsor and Maidenhead)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Jul 2014 (reference 14/02044/FULL, planning authority Windsor and Maidenhead)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Oct 2014 (granted, reference 14/02044/FULL, planning authority Windsor and Maidenhead)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSirius Solar BuildingDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area5.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.4482, -0.5402DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Wraysbury Landfill is the 2,217th-largest of 3,430 power plants in England and the 3,306th-largest of 5,050 in the United Kingdom by capacity; its 4.8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,217th of 3,43071,985 MW<0.1%
United Kingdom3,306th of 5,050115,642 MW<0.1%
All power plants in our data8,964th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 14/02044/FULL
  2. Started operating

Nearby

Within 50 km of this power plant: 195 substations, 154 data centers (1 operating, 88 MW), 128 grid connections (69 operating, 707 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Egham PrimarySubstation——1.8 km
Causeway PrimarySubstation——1.9 km
Sidney Road PrimarySubstation——2.9 km
Ready - 50MW Battery grid connectionGrid connection50 MWPlanned3.4 km
Waste 3.325 MW grid connection at CausewayGrid connection3.33 MWOperating4.5 km
Lakeside Energy From Waste Limited grid connectionGrid connection43.4 MWOperating4.7 km
British Telecom Computer CentreData center——5.7 km
Serverfarm LON1 – London Data CenterData center——6.0 km
Digital Realty LHR17Data center——6.7 km

Operator and place

More from Sirius Solar Building

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page