Power plant · Somerset, England, United Kingdom
Withy End
Withy End is a cancelled power plant in Somerset, England, United Kingdom, with 10 MW of capacity, operated by EDF Energy Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Somerset (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land at, Withy End, Causeway, Woolavington, | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 23 Dec 2013 (reference 54/13/00023, planning authority Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 7 May 2015 (refused, reference 54/13/00023, planning authority Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | EDF Energy Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 5 units (2 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.1863, -2.9518 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit refused (planning authority Somerset, reference 54/13/00023)
- Permit applied for (planning authority Somerset, reference 54/13/00023)
How it compares
Withy End is the 1,102nd-largest of 3,430 power plants in England and the 1,838th-largest of 5,050 in the United Kingdom by capacity; its 10 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,102nd of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 1,838th of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 7,081st of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 45 grid connections (26 operating, 199 MW), 20 substations, 7 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tata Communications Highbridge Datacentre | Data center | — | — | 4.7 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 19 km |
| Insight Data Ltd | Data center | — | — | 19 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 21 km |
| Fleet Air Arm Museum grid connection | Grid connection | 4.01 MW | Operating | 29 km |
| Southfield Farm Solar Park grid connection | Grid connection | 7.6 MW | Operating | 30 km |
| Solar 9 MW grid connection at Yeovil | Grid connection | 9 MW | Operating | 32 km |
| Sparkford Primary | Substation | — | — | 33 km |
| Chilton Cantello Primary | Substation | — | — | 33 km |
Operator and place
More from EDF Energy Renewables
- Springwell, Lincoln - Springwell Solar Farm & Battery Storage800 MW · permitted
- Abergelli Farm, Felindre - Battery Storage250 MW · planned
- Clash Gour225 MW · permitted
- Dorenell Wind Farm (Previously Site A and B Scaut Hill)177 MW
- Dorenell Wind Farm (extension)175 MW
- Fallago Rig144 MW
- Hickling Lane, Swainsthorpe -Battery Storage114 MW · permitted
- Heathland Wind Farm80 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.