Power plant · Warrington, England, United Kingdom
Winwick Link Road, Winwick - Anaerobic Digestion Facility
Winwick Link Road, Winwick - Anaerobic Digestion Facility is a planned power plant in Warrington, England, United Kingdom, with 1 MW of capacity, operated by Warrington Borough Council.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Warrington (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | E/O Winwick Link Road, Winwick, Warrington, WA2 0RL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 21 Jul 2025 (reference 2025/00859/FULM, planning authority Warrington) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Warrington Borough Council | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Anaerobic Digestion | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.4337, -2.5805 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority Warrington, reference 2025/00859/FULM)
How it compares
Winwick Link Road, Winwick - Anaerobic Digestion Facility is the 2,080th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,100th-largest of 3,222 in the United Kingdom by capacity; its 1 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,080th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 3,100th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 6,333rd of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 349 grid connections (191 operating, 1,705 MW), 336 substations, 17 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Verizon Warrington | Data center | — | — | 2.0 km |
| Parkside Railway Station grid connection | Grid connection | 3 MW | Operating | 2.1 km |
| Risley | Substation | — | — | 3.8 km |
| Iron Mountain | Data center | — | — | 3.9 km |
| Unit 1 Junction Lane grid connection | Grid connection | 5.26 MW | Planned | 4.2 km |
| Golborne CHP grid connection | Grid connection | 3.54 MW | Planned | 4.2 km |
| Newton Le Willows | Substation | — | — | 4.5 km |
| Culcheth | Substation | — | — | 4.7 km |
| Data center, England (OSM way 1551100328) | Data center | — | — | 6.0 km |
Operator and place
More from Warrington Borough Council
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.