Power plant · Mansfield, England, United Kingdom
Welbeck Colliery
Welbeck Colliery is a power plant in Mansfield, England, United Kingdom, with 11.3 MW of capacity, operated by Foresight.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Mansfield (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Elkesley Road, Meden Vale, Mansfield, Nottinghamshire, NG20 9PS | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2014 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 11 Feb 2013 (permit 2012/0557/NT, Town and Country Planning Act, issued by Mansfield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 21 Nov 2012 (reference 2012/0557/NT, planning authority Mansfield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 11 Feb 2013 (granted, reference 2012/0557/NT, planning authority Mansfield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Foresight | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 11.3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 23.1 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.2247, -1.1346 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority Mansfield, reference 2012/0557/NT)
- Permit applied for (planning authority Mansfield, reference 2012/0557/NT)
How it compares
Welbeck Colliery is the 1,026th-largest of 3,430 power plants in England and the 1,749th-largest of 5,050 in the United Kingdom by capacity; its 11.3 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,026th of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 1,749th of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 6,640th of 12,032 | 1,190,447 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 156 grid connections (84 operating, 926 MW), 137 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wind 20.22 MW grid connection at Pennyhill Windfarm | Grid connection | 20.2 MW | Operating | 13 km |
| Wind 4.5 MW grid connection at Kiveton Park | Grid connection | 4.5 MW | Operating | 15 km |
| Kiveton Park | Substation | — | — | 15 km |
| Battery storage 40 MW grid connection at Kiveton Park PS Direct | Grid connection | 40 MW | Planned | 15 km |
| Costhorpe | Substation | — | — | 16 km |
| Dinnington | Substation | — | — | 18 km |
| nLighten Nottingham | Data center | — | — | 25 km |
| Digital Space DC - Newark | Data center | — | — | 28 km |
| Hive IT | Data center | — | — | 28 km |
Operator and place
More from Foresight
- Frodsham Marsh50.4 MW
- Snarlton Farm (Melksham solar farm)49.6 MW
- Port of Tyne35 MW
- Water Eaton Farm / Port Farm34.8 MW
- Tirgwynt24.6 MW
- Verwood Solar Farm20.4 MW
- Prestop Park Farm16 MW
- Homeland Solar Farm13.2 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.