Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cheshire West and Chester (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land between Manchester Ship Canal and M56 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 19 Oct 2012 (Town and Country Planning Act, issued by Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Feb 2010 (planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 19 Oct 2012 (granted, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Foresight (Foresight/Belltown) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Belltown (Foresight/Belltown) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 50.4 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 19 units (2.65 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.3014, -2.7661 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Frodsham Marsh is the 149th-largest of 3,430 power plants in England and the 322nd-largest of 5,050 in the United Kingdom by capacity; its 50.4 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 149th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 322nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 1,775th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act)
- Started operating
Nearby
Within 50 km of this power plant: 225 grid connections (130 operating, 1,146 MW), 18 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| The Babbage Centre | Data center | — | — | 3.2 km |
| nLighten Chester | Data center | — | — | 13 km |
| nLighten Edge Data Centre Liverpool | Data center | — | — | 15 km |
| Unit 1 Junction Lane grid connection | Grid connection | 5.26 MW | Planned | 18 km |
| Parkside Railway Station grid connection | Grid connection | 3 MW | Operating | 20 km |
| Lymes Wood Landfill Site grid connection | Grid connection | 1.17 MW | Operating | 20 km |
| Keuper Underground Gas Storage Facility Material Change 1 | Gas storage facility | — | Planned | 22 km |
| Keuper Gas Storage Project | Gas storage facility | — | Permitted | 23 km |
| Salinae Hydrogen Storage project | Gas storage facility | — | Planned | 27 km |
Operators and place
More from Foresight
- Snarlton Farm (Melksham solar farm)49.6 MW
- Port of Tyne35 MW
- Water Eaton Farm / Port Farm34.8 MW
- Tirgwynt24.6 MW
- Verwood Solar Farm20.4 MW
- Prestop Park Farm16 MW
- Homeland Solar Farm13.2 MW
- Welbeck Colliery11.3 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.