Weeland Road, Kellingley - Solar Farm is a planned solar power plant in North Yorkshire, England, United Kingdom, with 10 MW of capacity, operated by Ivegate Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWeeland Road, Kellingley, Knottingley, WF11 8EFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Oct 2024 (reference ZG2024/0936/FULM, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorIvegate Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area14 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7105, -1.2020DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority North Yorkshire, reference ZG2024/0936/FULM)

How it compares

Weeland Road, Kellingley - Solar Farm is the 1,157th-largest of 1,651 power plants planned, permitted or under construction in England and the 1,858th-largest of 2,549 in the United Kingdom by capacity; its 10 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,157th of 1,651172,174 MW<0.1%
United Kingdom1,858th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data4,928th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 440 grid connections (224 operating, 2,559 MW), 377 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 200 MW grid connection at Stocking Lane BESS DirectGrid connection200 MWPlanned0.3 km
Battery storage 240 MW grid connection at NEL Conway2 BESS DirectGrid connection240 MWPlanned0.3 km
Gas 7 MW grid connection at BealGrid connection7 MWOperating0.4 km
BealSubstation——0.6 km
Weeland RoadSubstation——2.6 km
Ferrybridge ASubstation——4.6 km
HSBC Wakefield Data CentreData center——12 km
nLighten LeedsData center——13 km
Yorkshire GREENTransmission line—Permitted22 km