Power plant · Bolsover, England, United Kingdom

Twin Yards Solar Farm

Twin Yards Solar Farm is a power plant in Bolsover, England, United Kingdom, with 5 MW of capacity, operated by Global Renewable Construction.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBolsover (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand To The South East Of, The Hideaway, Pasture Lane, Hilcote, Alfreton, Derbyshire, DE55 5HQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Sept 2015 (permit 15/00327/FUL, Town and Country Planning Act, issued by Bolsover)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Jul 2015 (reference 15/00327/FUL, planning authority Bolsover)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Sept 2015 (granted, reference 15/00327/FUL, planning authority Bolsover)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGlobal Renewable ConstructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.1195, -1.3183DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Twin Yards Solar Farm is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,758th of 3,43071,985 MW<0.1%
United Kingdom2,742nd of 5,050115,642 MW<0.1%
All power plants in our data8,356th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 15/00327/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 111 substations, 110 grid connections (60 operating, 629 MW), 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned13 km
nLighten NottinghamData center——14 km
DronfieldSubstation——22 km
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating23 km
Kiveton ParkSubstation——24 km
Wind 4.5 MW grid connection at Kiveton ParkGrid connection4.5 MWOperating24 km
Battery storage 40 MW grid connection at Kiveton Park PS DirectGrid connection40 MWPlanned25 km
JordanthorpeSubstation——25 km
ExperianData center——29 km

Operator and place

More from Global Renewable Construction

Other power plants in England

All 5809 power plants in England, United Kingdom