Power plant · Derbyshire Dales, England, United Kingdom

Twin Oaks Farm

Twin Oaks Farm is a cancelled solar power plant in Derbyshire Dales, England, United Kingdom, with 5 MW of capacity, operated by Global Renewable Construction.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDerbyshire Dales (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTwin Oaks Yelt Lane, Doveridge, DE6 5JWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Oct 2015 (permit 15/00527/FUL, Town and Country Planning Act, issued by Derbyshire Dales)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jul 2015 (reference 15/00527/FUL, planning authority Derbyshire Dales)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Oct 2015 (granted, reference 15/00527/FUL, planning authority Derbyshire Dales)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGlobal Renewable Construction (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.76 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8987, -1.8110DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Derbyshire Dales, reference 15/00527/FUL)
  2. Permit applied for (planning authority Derbyshire Dales, reference 15/00527/FUL)

How it compares

Twin Oaks Farm is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,910th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 15 grid connections (9 operating, 116 MW), 10 substations, 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned29 km
Internet Central data center, EnglandData center——33 km
Ashwood DaleSubstation——40 km
Buxton 1 Battery grid connectionGrid connection16 MWOperating41 km
Waterswallows 1 Battery grid connectionGrid connection14 MWOperating41 km
nLighten NottinghamData center——42 km
Hutchison 3GData center——42 km
Tunstead Stor 1 grid connectionGrid connection16 MWOperating42 km
WaterswallowsSubstation——42 km

Operator and place

More from Global Renewable Construction

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page