Power plant · Fenland, England, United Kingdom

Treading Bank Solar Farm

Treading Bank Solar Farm is a cancelled power plant in Fenland, England, United Kingdom, with 49.9 MW of capacity, operated by Renewable Connections.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFenland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSw/O Treading Bank, Tydd St Giles, Wisbech, PE13 5LEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Oct 2025 (reference F/YR25/0758/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Dec 2025 (refused, reference F/YR25/0758/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRenewable ConnectionsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area96.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.7284, 0.1148DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Fenland, reference F/YR25/0758/F)
  2. Permit applied for (planning authority Fenland, reference F/YR25/0758/F)

How it compares

Treading Bank Solar Farm is the 175th-largest of 3,430 power plants in England and the 362nd-largest of 5,050 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England175th of 3,43071,965 MW<0.1%
United Kingdom362nd of 5,050115,622 MW<0.1%
All power plants in our data1,865th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 4 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Positive ParkData center——17 km
Kings Lynn B Connection ProjectTransmission line—Permitted17 km
Longmarsh Green EnergyData center—Planned18 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned30 km
Triton Knoll Electrical SystemTransmission line—Permitted32 km
Data center, England (OSM way 87850427)Data center——32 km

Operator and place

More from Renewable Connections

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page