Power plant · Epping Forest, England, United Kingdom

Thrift Solar Farm and BESS

Thrift Solar Farm and BESS is a permitted power plant in Epping Forest, England, United Kingdom, with 30 MW of capacity, operated by Vogt Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEpping Forest (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Tawney Common, Theydon Mount, Epping, CM16 7PUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date24 Dec 2025 (permit EPF/1216/25, Town and Country Planning Act, issued by Epping Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jun 2025 (reference EPF/1216/25, planning authority Epping Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Dec 2025 (granted, reference EPF/1216/25, planning authority Epping Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVogt SolarDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area34.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6898, 0.1707DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Thrift Solar Farm and BESS is the 991st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England991st of 2,174186,088 MW<0.1%
United Kingdom1,569th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 92 data centers (1 operating, 88 MW), 43 substations, 7 grid connections (3 operating, 18.6 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
NVIDIA Cambridge-1AI supercomputer202 H100eOperating9.2 km
Kao Data KLON-01Data center——9.3 km
Kao Data KLON-02Data center——9.4 km
Google Datacentre Waltham CrossData center——15 km
North London (Electricity Line) ReinforcementTransmission line—Permitted18 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating23 km
Tertiary Study grid connectionGrid connection57 MWPlanned26 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating34 km
Willesden GSPSubstation——34 km

Operator and place

More from Vogt Solar

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page