Power plant · Barking and Dagenham, England, United Kingdom

Thames Gateway EfW

Thames Gateway EfW is a cancelled power plant in Barking and Dagenham, England, United Kingdom, with 19 MW of capacity, operated by Thames Gateway Waste to Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBarking and Dagenham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLondon Sustainable Industries Park, Choats Road, Dagenham, RM9 6LNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Nov 2014 (permit 13/01134/FUL, Town and Country Planning Act, issued by Barking and Dagenham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Dec 2013 (reference 13/01134/FUL, planning authority Barking and Dagenham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Nov 2014 (granted, reference 13/01134/FUL, planning authority Barking and Dagenham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorThames Gateway Waste to Energy (Thames Gateway Waste to Energy (Chinook Urban Mining), applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity19 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAdvanced Conversion TechnologiesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5232, 0.1410DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Barking and Dagenham, reference 13/01134/FUL)
  2. Permit applied for (planning authority Barking and Dagenham, reference 13/01134/FUL)

How it compares

Thames Gateway EfW is the 892nd-largest of 3,953 power plants in England and the 1,523rd-largest of 5,723 in the United Kingdom by capacity; its 19 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England892nd of 3,95385,679 MW<0.1%
United Kingdom1,523rd of 5,723136,106 MW<0.1%
All power plants in our data4,517th of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 106 data centers (1 operating, 88 MW), 60 substations, 23 grid connections (13 operating, 101 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
NTT London 1Data center——3.6 km
OVH data center, EnglandData center——4.0 km
Virtual Internet UKData center——8.2 km
North London (Electricity Line) ReinforcementTransmission line—Permitted16 km
Tertiary Study grid connectionGrid connection57 MWPlanned16 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating25 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating27 km
Volt Avenue PrimarySubstation——28 km
Goldsmiths PrimarySubstation——28 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom