Power plant · Rugby, England, United Kingdom

T Main Road, Ansty - Battery Energy Storage System

T Main Road, Ansty - Battery Energy Storage System is a permitted power plant in Rugby, England, United Kingdom, with 200 MW of capacity, operated by FRV Tyler Hill BESS 1 Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRugby (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMain Road, Ansty, CV7 9HZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date12 Sept 2024 (permit R24/0010, Town and Country Planning Act, issued by Rugby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Feb 2024 (reference R24/0010, planning authority Rugby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Sept 2024 (granted, reference R24/0010, planning authority Rugby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFRV Tyler Hill BESS 1 LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity200 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.4476, -1.4111DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Rugby, reference R24/0010)
  2. Permit applied for (planning authority Rugby, reference R24/0010)

How it compares

T Main Road, Ansty - Battery Energy Storage System is the 177th-largest of 2,174 power plants planned, permitted or under construction in England and the 279th-largest of 3,222 in the United Kingdom by capacity; its 200 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England177th of 2,174185,888 MW0.11%
United Kingdom279th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data741st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 710050084)Data center——11 km
Santander data center, EnglandData center——20 km
Santander data center, EnglandData center——20 km
Weston Marsh to East LeicestershireTransmission line—Planned49 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom