Power plant · Newark and Sherwood, England, United Kingdom

Stud Solar Farm

Stud Solar Farm is a cancelled power plant in Newark and Sherwood, England, United Kingdom, with 25 MW of capacity, operated by Martifer Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNewark and Sherwood (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressStud Farm, Ossington Road, Carlton On Trent, NG23 6NXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Jun 2015 (permit 15/00324/FULM, Town and Country Planning Act, issued by Newark and Sherwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Feb 2015 (reference 15/00324/FULM, planning authority Newark and Sherwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Jun 2015 (granted, reference 15/00324/FULM, planning authority Newark and Sherwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMartifer Solar (Martifer Solar (Voltalia))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area38.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.1735, -0.8299DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Stud Solar Farm is the 464th-largest of 3,430 power plants in England and the 876th-largest of 5,050 in the United Kingdom by capacity; its 25 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England464th of 3,43071,985 MW<0.1%
United Kingdom876th of 5,050115,642 MW<0.1%
All power plants in our data3,247th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 390 grid connections (60 operating, 830 MW), 105 substations, 6 data centers and 4 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cobb Farm grid connectionGrid connection——5.4 km
Tuxford Westwood Solar Farm grid connectionGrid connection——8.5 km
Newark Sugar Factory, Muskham Road, grid connectionGrid connection——9.5 km
Digital Space DC - NewarkData center——11 km
StowSubstation——19 km
Lea RoadSubstation——24 km
Corringham RoadSubstation——26 km
nLighten NottinghamData center——32 km
North Humber to High MarnhamTransmission line—Planned32 km

Operator and place

More from Martifer Solar

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page