Power plant · Bassetlaw, England, United Kingdom
Steeple Renewables Project
Steeple Renewables Project is a planned battery storage plant in Bassetlaw, England, United Kingdom, with 150 MW of capacity, operated by Renewable Energy Systems RES ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bassetlaw (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | West Burton Power Station, Sturton-le-Steeple, Retford, DN22 9BL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Part of | Steeple Renewables Project (matched by planning reference) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Application date | 14 May 2025 (reference EN010163, planning authority The Planning Inspectorate - National Infrastructure) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Renewable Energy Systems RES ltd (Renewable Energy Systems RES Limited (Beaufort), applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 150 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.3661, -0.8162 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant and the records linked to it from official notices and registers, newest first. All recent changes.
- Permit granted: Steeple Renewables Project (planning authority The Planning Inspectorate, reference EN010163) · source
- Permit applied for: Steeple Renewables Project (planning authority The Planning Inspectorate, reference EN010163) · source
- Permit applied for (planning authority The Planning Inspectorate - National Infrastructure, reference EN010163)
How it compares
Steeple Renewables Project is the 211th-largest of 1,650 power plants planned, permitted or under construction in England and the 334th-largest of 2,548 in the United Kingdom by capacity; its 150 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 211th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 334th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 998th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 267 grid connections (131 operating, 1,781 MW), 180 substations, 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Lea Road | Substation | — | — | 3.9 km |
| Corringham Road | Substation | — | — | 5.9 km |
| Eminox Limited grid connection | Grid connection | 1.5 MW | Operating | 6.3 km |
| Gas 2.85 MW grid connection at Corringham Road | Grid connection | 2.85 MW | Operating | 6.3 km |
| Stow Park Road grid connection | Grid connection | 1.19 MW | Operating | 9.4 km |
| Stow | Substation | — | — | 9.4 km |
| North Humber to High Marnham | Transmission line | — | Planned | 11 km |
| Thales | Data center | — | — | 25 km |
| Digital Space DC - Newark | Data center | — | — | 32 km |
Operator and place
More from Renewable Energy Systems RES ltd
- Steeple Renewables Project450 MW · planned
- Beane Solar Farm - Solar Panels354 MW · planned
- Rayleigh Spur Roundabout, Benfleet - Battery Energy Storage System150 MW · planned
- Bishops Dal - Battery Energy Storage System150 MW · planned
- West Leake Lane, Ratcliffe - Battery Storage99.9 MW · permitted
- Caldwell Road - Battery Storage90 MW · permitted
- Beane Solar Farm - Solar Panels49.9 MW · planned
- Tooter Hill and Hogshead Hill3 MW
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.